Skip to content
Pairlot Request the stock list

Buyer support: what the desk does for you

A sourcing desk is judged between orders as much as during them. Beyond routing production, the desk keeps you working from live lists, written specs, checked labels and planned reorders - so the program keeps moving without you chasing a factory floor. Start with the request form.

Desk with blank spec sheets, a plain sneaker and a measuring tape

What support means at a desk

A directory forwards your message to a factory and disappears. A desk carries the program between orders as well as during them, because most of what a buyer needs is not production capacity - it is information kept current, documents kept accurate and dates kept honest. The six areas below run on both routes: stock programs bought by the carton and OEM programs built to a spec sheet.

Support is also where the two routes hand over to each other. A stock buyer who finds a style that sells needs it converted to an OEM program with labels the next season; an OEM buyer waiting on bulk needs stock cartons to cover the gap. The desk sees both sides of those handovers, which is why the support areas are the same either way - only the clock changes.

Live list access

The stock list changes as cartons ship, which makes last month's catalog a liability. The desk works from the live list - the models, colors and size runs actually on hand - and confirms it in writing at RFQ, so a program is planned against real quantities instead of a snapshot. When a model runs out mid-program, the reply names the closest alternatives from the same category rather than leaving a gap. The list and its limits are described in the stock route, and the structure of a first order in the lot buying guide.

Spec writing

On the OEM route, the spec sheet is the program: the document the factory quotes against, samples to, and gets inspected by. The desk writes it from your brief - materials, construction, size grid, packing, labels, carton marking - and sends it back for approval before sampling starts. You do not need to know how to write one; you need to know what you want, and the desk turns that into the factory's language. What belongs in the document is laid out in the spec sheet template, and the route around it in the OEM guide.

Label checks

Labels fail programs in boring ways: a material percentage that does not match the spec, a missing origin statement, a carton marking the warehouse cannot read. The desk drafts and checks label copy against the confirmed spec before bulk, and settles carton marking before sealing, when a correction costs a conversation instead of a repack. What US labels must carry - and what stays with your broker - is mapped in the compliance page.

Test planning

Where a channel needs material test reports or children's product testing, the work is calendar work: which tests, at which kind of lab, in which week of the schedule. The desk plans lab time into the program, sequences it with production, and verifies reports by certificate or report number per program - the desk never claims certificates of its own. For kids' programs this is the difference between a schedule and a surprise, because lab work discovered late costs weeks.

Reorder management

The second order is where a desk earns its keep. Send what sold and at which sizes; the desk reconfirms against the live list for stock, proposes substitutes where a model has run out, or reopens the same OEM platform with size-run corrections built in. Timing is part of the service: reorders placed before the peak-season squeeze keep the reference lead times realistic, and ones placed after it do not. The ranges are in MOQ and lead time, and season planning in planning footwear season orders.

Warehouse and marketplace prep

Many buyers ship straight into a marketplace or distributor warehouse, and those operations have conventions: how cartons are marked, where the size run sits, what the box label must carry, how mixed models are flagged. The desk sets that in the packing spec before sealing - your channel's rules, written on the program sheet, no improvisation at the dock. It is a small task done early and an expensive one done late, and it is the same packing discipline the OEM route uses for branded programs, minus the branding. Pallet notes and inner-box counts follow the same rule: whatever your channel needs printed, stuffed or stacked is written once, on the program sheet.

Support at a glance

AreaWhat the desk doesWhat you provide
Live listConfirms current models, colors and size runs at RFQCategory and size needs
Spec sheetWrites materials, construction, sizes, packing, labelsBrief, references, target date
LabelsDrafts and checks label copy against the specLabel text and artwork
TestsPlans lab time; verifies reports by numberYour channel's requirements
ReordersReconfirms against the live list; tracks timingSell-through by size
Warehouse prepSets carton marking and packing before sealingMarking rules of your channel

The reorder cycle

  1. Sell-through notes. You send what moved, at which sizes and colors.
  2. Reconfirmation. The desk checks the live list or the OEM platform and proposes the reorder plan.
  3. Confirmation in writing. Quantities, packing, marking and the dispatch or production date.
  4. Pick or produce. Stock is picked on confirmation; OEM runs to the approved sample.
  5. Check and dispatch. Cartons verified against the program sheet before they seal.

Between orders

Program records stay with the desk: the spec sheets, the approved samples on file, the packing decisions, the inspection results. The next order starts from history instead of from scratch, which is most of what makes the second program faster than the first. Replies go out in writing, usually within two working days, and questions that cannot be answered yet come back with what is still open. If a range plan is taking shape, send it with the request form and the first reply will name the route, the list or sampling plan, and the decisions waiting on you.

Questions buyers ask

How fast does the desk reply?

In writing, usually within two working days. A first reply names the route, the list or sampling plan, and the questions still open, so your next decision is clear instead of waiting on another round of messages.

Do I need a spec sheet to start?

No. Stock programs start from the live list. A spec sheet is written for OEM programs, and the desk drafts it from your brief - materials, construction, sizes, packing and labels - for your approval before sampling starts.

Can you prepare cartons for marketplace warehouses?

Yes, in general terms: carton marking, size-run placement and box labels are set in the packing spec before sealing. Send your warehouse's marking conventions with the brief; the exact requirements are confirmed on the program sheet.

How do reorders work on stock?

Send what sold and at which sizes. The desk reconfirms availability against the live list that week, proposes substitutes where a model has run out, and confirms the reorder in writing before picking starts.

Who handles the lab testing?

Testing runs at third-party laboratories. The desk plans lab time into the schedule and verifies reports by certificate or report number per program. For children's programs, lab work is sequenced with the production calendar.

Send the styles, sizes and a quantity in cartons. The desk replies in writing with the live stock list, the OEM sampling plan, and the figures that still need deciding.

Request the stock list