Skip to content
Pairlot Request the stock list

Sneaker MOQ and lead time, by route

Two numbers decide whether a sneaker program works: how many pairs you commit, and how long it takes to cartons. Here are the desk's reference ranges for both routes - and how they get confirmed in writing for your program on the request form.

Cartons lined up on picking shelves in the partner's warehouse

Ranges, not promises

Any number quoted without seeing your program is a guess. Footwear minimums and lead times move with the style, the construction, the season and the factory's queue, so the desk quotes reference ranges first and confirms exact figures in writing once the program is defined. That order protects both sides: you can plan a season on the ranges below, and your commitments are made against written figures that describe your program, not an average of someone else's.

RouteReference rangeBasis
In-stock lotsBy the carton; 12 pairs per carton, mixed models allowed per cartonSupplier packing list
Stock dispatchOrders picked immediately upon confirmation; typical dispatch within daysSupplier statement
OEM samplesDevelopment + counter-sample, typically about 15-30 daysFootwear industry practice
OEM bulkTypically about 45-60 days after sample approval; longer before peak seasonFootwear industry practice
OEM MOQSet per style and tooling; confirmed per programIndustry practice

The stock route: minimums in cartons

Stock minimums are counted in cartons because stock is picked, not made. Each carton holds 12 pairs in a size run, and mixed models are allowed within a carton, so even a small program can spread across several styles. Orders are picked immediately upon confirmation and typically dispatch within days. The constraint sits on the other side of that speed: the list changes as cartons ship, so a program is always confirmed against the list as it stands that week, in writing at RFQ - never against a catalog page. See how the list is presented on the stock route.

The OEM route: minimums per style

OEM minimums are set per style and per tooling because an OEM program creates costs that exist before production starts: sample uppers cut and stitched, molds built or adapted, a line timed for your construction. Those costs do not scale down with quantity, so the minimum exists to carry them. That is also why the number moves with design decisions: a new upper on an existing platform sits far lower than a fully sculpted new sole. The desk quotes minimums per program in writing - there is no universal figure. The MOQ walkthrough explains the two economies behind that in depth.

How color depth moves the minimum

Colors are planned in dye lots, printing screens and material runs, each set per colorway. Two colors at depth are a simpler program than six colors spread thin: the same total quantity concentrates into fewer changeovers, and the minimum follows. When a range plan calls for many colors, the honest options are to raise the total quantity, cut the palette, or put the extra colors on the stock route, where depth already exists in core colorways. Color depth is a planning decision, and the desk would rather make it with you at spec-sheet stage than discover it at quotation.

How size runs move the minimum

A full adult run spans EU 36-45 - nine size steps - and every step needs pairs in the size curve. A tighter run concentrates the same quantity into fewer steps; a kids' or women's run at 36-41 changes the curve again. The run you choose should match how your channel actually sells, not how a size chart reads. If your market buys through the middle steps, a concentrated run lowers the minimum and raises sell-through at once; if you serve a broad retail floor, the full run earns its width. Final grading is confirmed on the spec sheet per program, and the conversion context sits on the size chart page.

The clock, stage by stage

StageStock routeOEM route
Program confirmedPicking starts immediatelySpec sheet locked; sampling scheduled
Before bulkNot applicable - the shoes existDevelopment + counter-sample, about 15-30 days
ProductionNot applicableAbout 45-60 days after sample approval
To dispatchTypically within days of confirmationAfter inspection against the approved sample

Read the two columns as two clocks. The stock clock starts at confirmation and ends in days. The OEM clock has two hands: samples first, then bulk after approval - and the approval is the hinge, because a slow feedback round costs more time than any factory stage.

Before peak season, add margin

OEM bulk runs longer before peak season. Lines fill, material queues lengthen, and every factory in the cluster competes for the same weeks. The reference range already says about 45-60 days; close to a peak it is prudent to plan the top of that range and start conversations earlier. The desk flags seasonal pressure in the first reply, so the program's dates reflect the calendar it will actually run in. See planning orders around selling seasons.

What the desk does not quote

Three things stay off the table by design. Prices are never published on the site - they are quoted per program from the live list or the approved spec sheet. There is no universal minimum that applies to every style, because tooling and platform decisions make each style its own case. And factory-level figures such as staff, lines and monthly output are not invented here: they come from the factory profile, provided on request, so your program is planned on documented capacity rather than a marketing number.

Your program's numbers, in writing

Ranges are for planning; programs run on written figures. Send the route you lean toward, the styles, size range and quantity on the request form, and the reply comes back with the figures that matter for your case: the live stock list and dispatch window, or the OEM minimum, sampling plan and bulk window per style. For how sampling fits the clock, read the sampling process; for structuring a first order, see the lot buying guide.

Questions buyers ask

What is the minimum on the stock route?

Stock is sold by the carton: 12 pairs per carton, with mixed models allowed within a carton. Your exact carton plan is confirmed in writing at RFQ against the live list.

How fast does stock dispatch?

Orders are picked immediately upon confirmation, and typical dispatch is within days. The dispatch date for your program is confirmed in writing when the program is confirmed.

What is the OEM sample lead time?

Development sample plus counter-sample typically takes about 15-30 days. A design on an existing platform samples faster than one needing new tooling; your program's schedule is confirmed in writing.

How long does OEM bulk take?

Typically about 45-60 days after sample approval, and longer before peak season. The window for your style and season is confirmed in writing before bulk starts.

What is the OEM minimum order?

It is set per style and tooling and confirmed per program. Platform reuse and concentrated color and size plans are the levers that move it down.

Send the styles, sizes and a quantity in cartons. The desk replies in writing with the live stock list, the OEM sampling plan, and the figures that still need deciding.

Request the stock list