Skip to content
Pairlot Request the stock list

Wholesale footwear terms explained: FOB to lead time

Footwear quoting has its own vocabulary, and most first-order misunderstandings are vocabulary accidents: two sides using the same word for different scopes. Here are the terms as the desk uses them, each with the one thing worth getting in writing.

Why the vocabulary matters

Trade terms are not ceremony; they are the boundary lines of a price. A figure quoted ex-factory includes a different set of obligations than the same figure quoted FOB, and a buyer who assumes otherwise discovers the difference as a surprise invoice at the port. The same is true downstream: a lead time quoted from confirmation means one thing, from sample approval another; a size run described loosely can hide a carton your channel cannot sell. None of this requires a trade degree. It requires that both sides attach the same meaning to a short list of words, which is what this note is for - and why the desk restates every term in writing on each program sheet.

The terms, one by one

Ex-factory (EXW)
The price applies at the factory or warehouse door. You arrange and pay for everything onward: inland movement, export clearance, ocean or air freight, import clearance, delivery. The buyer carries the most; the supplier the least.
FOB (free on board)
The price covers the goods plus inland movement and export clearance, delivered on board the vessel at the named origin port. Risk passes at the ship's rail; the ocean freight, insurance and import side are yours. In footwear quoting this is a common default, and the named port matters - always check which one.
Lead time
The clock from a defined start to a defined finish. The start matters as much as the number: stock programs count from confirmation, and are picked immediately, typically dispatching within days; OEM bulk counts from sample approval, typically about 45-60 days, longer before peak season. A lead time without a start point is not a lead time.
CTN (carton)
The shipping carton - on the stock route, 12 pairs per carton, cartons in the range of about 70-77 x 41.5-45.5 x 32.5-34.5 cm, marked with model, color, size run and pieces. Orders are planned and priced in cartons, so carton counts are the arithmetic of every quote.
Size run
The distribution of sizes inside a carton. Stock runs step 1-2-3-3-2-1 across the six size steps, over EU 36-45 on most models and 36-41 on some women's and kids' runs. The run is fixed per model on the list and shown per color - confirm it per program, because your channel's demand curve has to live inside it.
MOQ (minimum order quantity)
The smallest order a program accepts. Stock minimums are counted in cartons and mixed models are allowed within a carton; OEM minimums are set per style and tooling, because they exist to recover sampling and molds. There is no universal number - only the figure confirmed per program in writing.
Sample and counter-sample
The development sample shows the design; the counter-sample shows what the factory proposes to build, and once approved it becomes the golden sample bulk is checked against. OEM sampling typically runs about 15-30 days for development plus counter. On stock there is nothing to sample - the shoes exist, which is the route's whole appeal.
Spec sheet
The document that states the program: materials, construction, sizes, grading, packing, labels, marking. Quotes and inspections both point back to it. A program without a spec sheet is a conversation, not an order.
RFQ (request for quote)
Your brief in a form a supplier can price: route, styles, colors, size runs, quantity, destination, dates. The desk's request form is exactly this, and a good RFQ gets a quotable answer in one round instead of four.

The same terms, side by side

TermPlain meaningConfirm in writing
Ex-factoryPrice at the supplier's door; buyer carries everything onwardWhich door, and who books the collection
FOBSupplier delivers cleared goods on board at the origin portThe named port, and what inland legs are included
Lead timeClock from a defined start to dispatchThe start point: confirmation, or sample approval
CTNCarton; the unit stock is sold and planned inPairs per carton, dimensions, marking
Size runSize distribution inside the cartonThe exact run per model and color
MOQSmallest accepted order for the programPer style and tooling, for your program only
Golden sampleApproved counter-sample bulk is checked againstThat it exists, is signed off, and is referenced at inspection
Spec sheetWritten program: materials, sizes, packing, labelsThat the quote and inspection both cite it

Reading a quote against the terms

With the vocabulary fixed, a quote can be read the way an accountant reads a ledger: line by line, asking which terms each figure assumes. Is the price ex-factory or FOB, and at which port. Does the lead time run from confirmation or approval. How many cartons, at what run, in which marking. Which labels and certificates the program assumes - in the United States, footwear labeling follows the FTC shoe content rules, and children's programs carry the CPSIA regime. A quote that answers these is quotable back to your own finance team; one that does not is a placeholder. The desk's quotes are built to survive that reading, and the reference ranges behind stock dispatch, sampling and bulk are collected on the MOQ and lead time page.

Where buyers lose money on words

The recurring losses are boring ones: an FOB price assumed to include inland delivery at destination; a bulk date assumed to run from deposit when it runs from sample approval; a carton count assumed to be pairs; a size run assumed to be flexible when it is fixed on the list. Each is a one-sentence clarification at RFQ and a one-line clause on the program sheet - and each, skipped, becomes a dispute with no document to point at. The buying sequence that keeps the words straight is walked through in how to source sneakers from China, and the document that pins the program down in sneaker spec sheet. Keep a one-page glossary of your own - the terms as your company uses them - and attach it to every RFQ; suppliers match the vocabulary they are given, and the misunderstandings stop before they start. Bring your terms questions to the request form, or read the wholesale framing first on the wholesale page.

Questions buyers ask

What is the difference between ex-factory and FOB?

Ex-factory prices the goods at the supplier's door, and you carry every onward cost: inland movement, export and import clearance, freight. FOB includes inland movement and export clearance to a named origin port, with ocean freight and import onward on your side. Always check which term and which port a quote uses.

When does a lead time clock start?

At a defined start point: stock programs count from confirmation and typically dispatch within days; OEM bulk counts from sample approval, typically about 45-60 days, longer before peak season. The desk states the start point in writing on every program.

What does a size run mean on a carton?

It is the distribution of sizes inside the carton. Stock runs step 1-2-3-3-2-1 across six size steps, over EU 36-45 on most models and 36-41 on some women's and kids' runs. The exact run per model is confirmed per program against the live list.

Is there one MOQ for footwear?

No. Stock minimums are counted in cartons of 12 pairs, with mixed models allowed, while OEM minimums are set per style and tooling to recover sampling and molds. The only number that counts is the one confirmed in writing for your program.

Send the styles, sizes and a quantity in cartons. The desk replies in writing with the live stock list, the OEM sampling plan, and the figures that still need deciding.

Request the stock list